Poltava

About the Project

CCK TM completed a ventilation project for the M.V. Sklifosovskyi Regional Clinical Hospital in Poltava, one of the leading healthcare institutions in the region providing both inpatient and outpatient medical services. For hospitals of this scale, maintaining a stable indoor climate and continuous air exchange is essential for patient comfort and the efficient work of medical staff.


Healthcare Ventilation Project Objectives

The primary objective of the project was to provide a reliable supply of fresh air throughout the hospital, maintain the required indoor temperature and humidity levels, and create a comfortable environment for patients and healthcare professionals. Particular attention was paid to the reliability of the ventilation system and its integration into the hospital's engineering infrastructure.


CCK TM Solution

As part of the project, CCK TM supplied equipment for the hospital's supply duct ventilation system.


Equipment

Purpose

Supply duct ventilation equipment

Provides a continuous supply of fresh air, maintains the required air exchange rate, and helps create a comfortable indoor environment throughout the hospital. The duct ventilation solution integrates efficiently into the building's engineering systems and ensures reliable long-term operation.


Project Results

The implemented solution provides a stable supply of fresh air, comfortable conditions for patients and medical staff, and reliable operation of the ventilation system. CCK TM equipment helps maintain the required indoor climate and supports the dependable operation of the hospital's engineering systems.