About the Project
CCK TM completed a ventilation project for Zaporizhzhia Central District Hospital. As part of the project, the radiology department was equipped with a modern ventilation system, where maintaining the required air exchange and a stable indoor climate is essential for patient comfort and daily medical operations.
Healthcare Ventilation Project Objectives
Healthcare facilities require reliable ventilation systems capable of providing continuous air exchange and maintaining the required indoor climate conditions. The project's primary objective was to ensure efficient ventilation of the radiology department while creating comfortable conditions for patients and medical staff and supporting the reliable operation of the building's engineering systems.
CCK TM Solution
As part of the project, CCK TM supplied ventilation equipment for the healthcare facility.
Equipment | Purpose |
VRAN centrifugal fans | VRAN centrifugal fans provide efficient exhaust air removal, stable air exchange, and reliable operation of the ventilation system. Their design combines high performance, energy efficiency, and low noise levels, making them well suited for healthcare environments. |
Project Results
The implemented solution provides the required air exchange in the radiology department, comfortable conditions for patients and medical staff, and reliable operation of the ventilation system. The CCK TM equipment helps maintain an optimal indoor climate while meeting the operational requirements of modern healthcare facilities.