Odesa

About the Project

CCK TM completed a ventilation project for the swimming pool at the Bila Akatsiia Health & Wellness Complex in Odesa. Swimming pool facilities are characterized by high humidity, continuous water evaporation, and chloramine-containing air, requiring a ventilation system capable of providing reliable and continuous air exchange under demanding operating conditions.


Swimming Pool Ventilation Project Objectives

The project's primary objective was to efficiently remove humid air, prevent condensation on building structures, maintain the required air exchange rate, and reduce chloramine concentration in the indoor environment. Particular attention was given to creating a comfortable and healthy indoor climate for visitors and staff.


CCK TM Solution

As part of the project, CCK TM supplied equipment for the swimming pool exhaust ventilation system.


Equipment

Purpose

KROS rooftop centrifugal fans

Designed for efficient exhaust of humid air from the swimming pool area. The high-efficiency backward-curved impeller, direct-drive design, and optional variable-speed control provide high performance, energy efficiency, and quiet operation.

STAM roof mounting curbs

Designed for the secure installation of rooftop fans, ensuring reliable mounting, airtight connections, structural stability, and protection against weather conditions.


Project Results

The implemented solution provides stable humidity control, efficient removal of exhaust air, and improved indoor air quality throughout the swimming pool area. The ventilation system helps prevent condensation and corrosion of building structures while ensuring compliance with sanitary requirements for sports and wellness facilities.

Type of equipment