Chisinau

About the Project

CCK TM completed a ventilation and air dehumidification project for the SportPark Swimming Pool in Chișinău. The swimming pool with four lanes is one of the key areas of the sports complex, where maintaining a stable indoor climate is essential for visitor comfort and the long-term protection of the building.


Swimming Pool Ventilation Project Objectives

Swimming pool facilities are characterized by high humidity and continuous water evaporation, creating a risk of condensation and corrosion. The main objective of the project was to provide efficient air exchange, maintain the required humidity level, dehumidify the air, and ensure comfortable conditions for visitors.


CCK TM Solution

As part of the project, CCK TM supplied a VRS 500 heat recovery air handling unit for the swimming pool ventilation system.


Equipment

Purpose

VRS 500

The VRS 500 unit supplies fresh or mixed air, provides efficient air dehumidification, maintains optimal indoor temperature, and controls relative humidity. The heat recovery system reduces energy consumption while improving the overall efficiency of the swimming pool ventilation system.


Project Results

The implemented solution ensures stable humidity levels in accordance with design requirements, efficient air dehumidification, and a comfortable indoor climate throughout the swimming pool area. The VRS 500 heat recovery air handling unit helps prevent condensation, protects building structures against corrosion, and improves the overall energy efficiency of the sports facility.