About the Project
CCK TM participated in the implementation of the ventilation system for FITLAND Fitness Club in Poltava, a modern sports facility offering both individual and group fitness activities. Sports facilities require stable air exchange and a well-controlled indoor climate, as physical activity significantly increases the demands on indoor air quality.
Ventilation Project Objectives for a Sports Facility
Intensive workouts generate excess heat, increased humidity, and higher carbon dioxide levels. The primary objective of the project was to provide efficient air exchange, ensure an even distribution of fresh air throughout the facility, and create comfortable conditions for athletes, trainers, and visitors.
CCK TM Solution
As part of the project, CCK TM supplied equipment for the club's duct ventilation system.
Equipment | Purpose |
Duct ventilation system equipment | The duct ventilation system components ensure efficient air distribution throughout all functional areas of the fitness club, maintain the required air exchange rate, and help create a comfortable indoor environment during sports activities. |
Project Results
The implemented solution provides stable air exchange and a comfortable indoor climate regardless of workout intensity. The ventilation system helps maintain optimal temperature and humidity levels while creating comfortable conditions for training throughout the year.