About the Project
CCK TM participated in the modernization of the engineering systems at the Kharkiv Philharmonic Hall, supplying ventilation and fire safety equipment.
Located on Rymarska Street, the Kharkiv Philharmonic Hall is a protected architectural landmark and one of the city's most significant cultural venues. As part of the restoration project, the building's engineering systems were upgraded to meet modern requirements for safety, reliability, and visitor comfort while preserving the historical value of the facility.
Project Objectives
The project was designed to achieve the following engineering objectives:
- modernize the ventilation systems of a historic building;
- provide an efficient smoke extraction system;
- improve overall fire safety;
- ensure the required air exchange within concert halls;
- maintain a comfortable indoor environment for audiences and performers.
CCK TM Solution
As part of the project, CCK TM supplied a complete ventilation solution.
Equipment | Purpose |
UKROS-DU/DUV | Roof-mounted smoke extraction fans designed to remove smoke and hot combustion gases during a fire. |
KPU-1N | Universal fire dampers for smoke containment and automatic isolation of ventilation ducts. |
| OZA 300/OZA 301 | Energy-efficient axial fans providing supply and exhaust ventilation. |
Air control devices | Equipment for regulating and balancing airflow throughout the ventilation system. |
Roof ventilation components | Roof-mounted accessories ensuring reliable operation and integration of the ventilation system into the building structure. |
Project Results
The installed CCK TM equipment ensures reliable operation of the ventilation and smoke control systems, maintains a comfortable indoor climate within the concert halls, and complies with modern engineering and fire safety requirements for public and cultural buildings.