About the Project
CCK TM supplied equipment for the smoke extraction ventilation system of the Taras Shevchenko Cherkasy Academic Drama Theatre.
As one of the leading cultural venues in Cherkasy, the theatre welcomes hundreds of visitors during performances and public events. Public buildings with high occupancy require reliable smoke control and fire safety systems to support safe evacuation and protect occupants in emergency situations.
Project Objectives
The project was designed to achieve the following engineering objectives:
- provide an efficient smoke extraction system;
- prevent the spread of smoke between different areas of the building;
- support the safe evacuation of visitors and staff;
- comply with modern fire safety regulations;
- ensure reliable system operation under emergency conditions.
CCK TM Solution
As part of the project, CCK TM supplied a complete smoke control ventilation solution.
Equipment | Purpose |
| KROV-DU/DUV | Roof-mounted centrifugal smoke extraction fans designed to remove smoke and hot combustion gases during a fire. |
KPU-1N | Fire dampers designed to contain smoke, control airflow, and prevent the spread of combustion products through the ventilation system. |
Project Results
The installed CCK TM equipment provides reliable operation of the theatre's smoke control ventilation system, supports safe evacuation during emergency situations, complies with modern fire safety requirements, and enhances the overall level of protection for the public building.