Lviv

About the Project

CCK TM participated in the implementation of the engineering systems for Creative International School in Lviv, a modern educational institution recognized as a member of the Microsoft Showcase Schools community. To ensure safe building operation and compliance with current fire safety requirements, the project included the installation of a smoke extraction system using CCK TM equipment.


Ventilation Project Objectives for an Educational Facility

Modern educational facilities require not only a comfortable indoor climate but also effective smoke control systems that help ensure safe evacuation in emergency situations. The primary objective of the project was to implement a reliable smoke extraction solution that enhances building safety and supports compliance with modern fire protection standards.


CCK TM Solution

As part of the project, CCK TM supplied smoke extraction equipment designed to meet the fire safety requirements for public and educational buildings.


Equipment

Purpose

KROV-DU/DUV

KROV-DU/DUV roof-mounted radial smoke extraction fan is designed to remove smoke and hot gases during a fire through a vertical air discharge. Its high-profile housing provides unrestricted airflow, while the design protects the system from weather exposure and simplifies installation. The impeller, with an efficiency of up to 75%, delivers high airflow capacity, high static pressure, and low noise levels, ensuring reliable operation of the smoke control system.


Project Results

The implemented solution enhanced the building's fire safety and ensured reliable operation of the smoke extraction system. The KROV-DU/DUV fan effectively removes smoke and hot gases during fire emergencies, supporting safe evacuation while helping the facility comply with modern fire safety requirements for educational buildings.