commissioning: 1973
Київ
CCK TM supplied equipment for the general ventilation system at a major energy facility — Trypilska Thermal Power Plant.
As part of the project, air control devices were delivered to ensure stable airflow distribution within industrial premises and support reliable system operation.
Scope of Work:
- supply of air control devices;
-
- integration into the general ventilation system;
-
- optimization of air duct performance;
-
- обеспечение compliant воздухообмена conditions for industrial operation.
Project Result:
- стабильный airflow within production areas;
- improved reliability of ventilation systems;
- compliance with industrial technical requirements;
- safe operating environment for equipment.