CCK TM Company supplied and implemented a complex of ventilation equipment for a chemical industry production facility.

The project implemented:

  • installation of a compact Airmate suspended air conditioner;
  • installation of KROS roof radial fans;
  • installation of STAM mounting cups;
  • integration of KPU-1N fire dampers into the duct system;
  • installation of AVD active vortex deflectors;
  • installation of air control devices (air dampers, ventilation grilles).

Implementation result:

  • stable air exchange in production premises was ensured;
  • the level of fire safety was increased;
  • the operation of the ventilation system was optimized;
  • compliance with the technical requirements of the facility was ensured.