commissioning: 1934
Кривий Ріг
CCK TM supplied ventilation equipment for ArcelorMittal Kryvyi Rih in Kryvyi Rih.
The plant operates a full metallurgical cycle, including coking, mining, and steel production, with blast furnace, steelmaking, and rolling departments.
Installed Equipment:
- fire dampers;
-
- air control devices.
Engineering Features.
The systems provide:
- efficient air circulation in industrial zones;
-
- climate control in production areas;
-
- compliance with safety standards;
-
- improved energy efficiency.
Project Outcome:
- stable indoor climate for industrial production;
- reliable fire safety system operation;
- compliance with safety regulations;
- reduced energy consumption.