commissioning: 1934
Кривий Ріг

CCK TM supplied ventilation equipment for ArcelorMittal Kryvyi Rih in Kryvyi Rih.

The plant operates a full metallurgical cycle, including coking, mining, and steel production, with blast furnace, steelmaking, and rolling departments.

Installed Equipment:

    • fire dampers;
      • air control devices.

      Engineering Features.

      The systems provide:

        • efficient air circulation in industrial zones;
          • climate control in production areas;
            • compliance with safety standards;
              • improved energy efficiency.

              Project Outcome:

              • stable indoor climate for industrial production;
              • reliable fire safety system operation;
              • compliance with safety regulations;
              • reduced energy consumption.