Chisinau

About the Project

CCK TM delivered a fire ventilation project for the Florilor Residence residential complex in Chișinău, Moldova. The development combines residential buildings, commercial and office premises, an underground parking facility, and modern on-site infrastructure. To ensure a high level of fire safety, the project was equipped with specialized ventilation equipment manufactured by CCK TM.


Project Objectives

The project focused on the following engineering objectives:

  • providing efficient smoke extraction during fire emergencies;
  • preventing the spread of smoke through ventilation ducts;
  • maintaining safe evacuation routes for residents and visitors;
  • integrating the ventilation system into the building's overall fire safety infrastructure;
  • ensuring reliable operation in accordance with modern fire safety standards.


CCK TM Solution


Installed Equipment

Purpose

KROV-DU/DUV roof-mounted centrifugal fans

Smoke and hot gas extraction during fire emergencies.

KPU-1N fire dampers

Automatic isolation of ventilation ducts to prevent the spread of fire and smoke.


The project incorporated a comprehensive CCK TM fire ventilation solution combining smoke extraction equipment and passive fire protection components. The KROV-DU/DUV roof-mounted fans provide reliable smoke removal, while the KPU-1N fire dampers isolate fire compartments and improve the overall efficiency of the building's fire safety system.


Project Results

The implemented fire ventilation system ensures reliable smoke extraction and enhances the overall safety of the residential complex during emergency situations. This project demonstrates CCK TM's successful experience in delivering modern ventilation solutions for international residential developments.

Type of equipment