Kharkiv

About the Project

CCK TM delivered a general and smoke extraction ventilation project for the Kliuch Residential Complex in Kharkiv. This business-class residential development is located near Sarzhyn Yar and includes two residential buildings, an underground parking facility, and modern engineering systems. To ensure efficient ventilation and fire safety, the complex was equipped with specialized ventilation equipment manufactured by CCK TM.


Project Objectives

The project focused on the following engineering objectives:

  • providing efficient air exchange throughout the residential buildings;
  • ensuring reliable smoke extraction during fire emergencies;
  • maintaining safe evacuation conditions for occupants;
  • preventing smoke spread between fire compartments;
  • delivering stable and reliable ventilation system performance.


CCK TM Solution


Installed EquipmentPurpose

UKROS-DU/DUV roof-mounted centrifugal fans

Vertical smoke and hot gas extraction using a flare-type discharge airflow.

OZA 300 energy-efficient axial fans

Supporting general ventilation and smoke control system operation.
KPU-1N fire dampers

Automatic isolation of ventilation ducts to prevent the spread of fire and smoke.


The project incorporated a comprehensive CCK TM ventilation solution combining general ventilation and smoke control systems. The UKROS-DU/DUV roof-mounted fans provide efficient smoke extraction through a flare-type air discharge and high-efficiency backward-curved impellers. The OZA 300 axial fans maintain reliable air exchange, while the KPU-1N fire dampers enhance the overall performance of the building's fire safety system.


Project Results

The implemented solution ensures reliable ventilation during normal operation and effective smoke extraction in emergency situations. The use of CCK TM equipment made it possible to deliver a modern engineering solution that meets current requirements for fire safety, energy efficiency, and long-term operational reliability.

Type of equipment